1. United States/
  2. Bass fishing in the United States/
  3. Louisiana/
  4. Bass fishing in Louisiana

Bass fishing in Louisiana

Louisiana provides strong freshwater fishing opportunities for bass. Lakes, rivers, and reservoirs across the state offer reliable action for anglers.

Types of Bass in Louisiana

Best baits and lures for Bass in Louisiana

BiteGuide combines your real-time weather, water conditions, and target species to suggest lures and colors that'll work right now. Built on millions of real catches from the world's largest fishing community.

Fishbrain
BiteGuide App featureBiteGuide App feature

The right bait right now

Find out what lures to use, download the Fishbrain app!

Download the Bitetime appDownload the Bitetime app
Download the Bitetime app
Download the Bitetime app
Download the Bitetime appDownload the Bitetime app
Download the Bitetime app
Download the Bitetime appDownload the Bitetime app
Download the Bitetime app

Biggest Bass catches

Explore your local leaderboard—see the top catches in the app.

Latest Bass fishing reports in Louisiana

Loading...

Largemouth bass

Alligator Lake

length · weight

Loading...

Largemouth bass

Marion Bonner (Fort Polk) Pond 2

13 in · 2 lb

Loading...

Largemouth bass

Marion Bonner (Fort Polk) Pond 2

length · weight

Loading...

Largemouth bass

Kepler Creek

16 in · 4 lb

Loading...

Largemouth bass

Bayou Desiard

length · weight

Loading...

Largemouth bass

Bayou Metairie

12 in · 1 lb 5 oz

Loading...

Largemouth bass

Bayou Metairie

8 in · 1 lb

Loading...

Largemouth bass

Bayou Rapides

length · weight

Loading...

Largemouth bass

Concession Canal

length · weight

Loading...

Largemouth bass

Bayou Metairie

20 in · 4 lb

Fishbrain
More catches in the app...

Continue browsing catches and catch locations in the Fishbrain app

Loading...
Loading...
Loading...

Regulations for Bass in Louisiana

Disclaimer: Always check local fishing regulations, water access rights and land ownership before fishing, regardless of any catches logged in that area by the Fishbrain community. Fishbrain has mapped millions of acres of government-owned land across the USA to help you identify potential fishing access, but you are responsible for ensuring compliance with all legal requirements.

Fishing regulations in Louisiana can change throughout the year. Make sure to check this page before fishing for the most up to date rules and regulations for the current season. Local regulations govern when you can fish, the max size of the fish you can keep, how many fish you can keep, and more.

Below you will see fishing regulations for catching Largemouth bass as of November 17th, 2026. To view regulations for a different fish species, please click on your preferred species in the drop-down.

Largemouth bass

Seasons

Open

Bag limit

10

Aggregate

10
Additional information
No size limit except as listed below for specified waters. The following waterbodies have modified size and bag limits for black bass (i.e., largemouth and spotted bass): Eagle Lake: 16-inch minimum total length; bag limit = 10 black bass; Poverty Point Reservoir Lake: 15-inch to 19-inch protected slot limit; bag limit = 8 black bass with no more than one over 19-inches total length; False River (Point Coupee Parish): 14-inch minimum total length; bag limit = 5 black bass; John K. Kelly - Grand Bayou Reservoir (Red River Parish): 14-inch to 17-inch protected slot limit; bag limit = 8 black bass with no more than four over 17-inches total length; Caddo Lake: 14-inch to 18-inch protected slot limit for largemouth bass (no size limit for spotted bass); bag limit = 8 black bass with no more than four over 18-inches total length; Toledo Bend Reservoir and the Sabine River above Toledo Bend to the point at which the entire river enters Texas: 14-inch minimum total length for largemouth bass (no size limit for spotted bass); bag limit = 8 black bass; Sabine River from Toledo Bend Dam to I-10: 12-inch minimum total length for largemouth bass (no size limit for spotted bass); bag limit = 8 black bass; Fish falling within a protected slot limit must be immediately released. A spotted bass is defined as a black bass with a tooth patch on the tongue.
Edibility
Very good Catch, Clean, Cook Largemouth Bass by BlueGabe
Synonyms

Micropterus nigricans

Regulations for

30°56′14.4″N 91°24′2.9″W
Regulations in the map
App Section
Download Fishbrain and fish smarter
Unlimited access to the best fishing spot finder in the game. Get all the fishing intel you need to start catching more, and bigger, fish.

Free trial available

Loading...
Loading...
Loading...
Loading...

FAQ

🎣 What Bass species can you catch in Louisiana?
Anglers in Louisiana commonly catch several Bass species, including Largemouth bass and Spotted bass, according to reports from Fishbrain members.

These species can be found in many lakes, inshore waters throughout the area. If you are targeting a specific species, you can use the to filter catches by species and see where anglers are catching them and which baits they are using.
📍 Where are the best places to catch Bass in Louisiana?
Bass are caught in lakes, inshore waters throughout Louisiana. Popular fishing waters reported by Fishbrain members include Lake Pontchartrain, Toledo Bend Reservoir, and Sabine Lake.

The allows anglers to see exact catch locations shared by other members, helping you discover productive fishing spots where Bass have recently been caught.